Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikace
DOMSITZOVÁ, M. SCHNEIDER, R.
Originální název
Application of project management tools in early planning phases to optimize the impact on quality, cost and time: A case study
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
The challenge of project management is to optimize the quality, cost and time parameters to smooth the implementation of the customer’s order as much as possible. This study introduces the possibilities of the performance implementation control, taking into account individual dependencies between the quality, cost and time - three aspects of the iron triangle. An already finished project that had to be completely redesigned during the fully running planning phase was used as a case study for implementing the tolls of Project Management and there impact.
Klíčová slova
Project management; Early planning phases; constructions
Autoři
DOMSITZOVÁ, M.; SCHNEIDER, R.
Vydáno
9. 8. 2023
Nakladatel
AIP Publishing
Místo
Melville, NY
ISSN
1551-7616
Periodikum
AIP Conference Proceedings
Ročník
2887
Číslo
1
Stát
Spojené státy americké
Strany od
Strany do
6
Strany počet
URL
https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with
BibTex
@inproceedings{BUT184370, author="Monika {Domsitzová} and Roland {Schneider}", title="Application of project management tools in early planning phases to optimize the impact on quality, cost and time: A case study", booktitle="14TH CONFERENCE OF CIVIL AND ENVIRONMENTAL ENGINEERING FOR PHD STUDENTS AND YOUNG SCIENTISTS: YOUNG SCIENTIST 2022 (YS22)", year="2023", journal="AIP Conference Proceedings", volume="2887", number="1", pages="1--6", publisher="AIP Publishing", address="Melville, NY", doi="10.1063/5.0158899", issn="1551-7616", url="https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with" }