Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BP52Acad. year: 2009/2010
The goal of the subject is to introduce pumping equipments in general, and devices for pumping of pure and waste water, sludge and selected chemicals in detail. The knowledge obtained in the subjects “Water Supply” and “Balneotechnics” will be extended into the field of sanitary installation and central heating network. Lessons will be amended by energy and financial balances, design of automatic water supply plants, vacuum stations and simple measurements for water hammer protection. The aim of the subject is to prepare sanitary engineers for solving simple cases of pump using and successful cooperation with mechanical engineers in case of complicated problems, as well as for design of civil engineering parts of pumping station.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
branch V , 4 year of study, winter semester, elective
Lecture
Teacher / Lecturer
Exercise