Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikačního výsledku
KREJZA, Z.; KOCOURKOVÁ, G.; VAŇKOVÁ, L.; ŠEBESTOVÁ, M.
Originální název
Variants of determining the construction production carbon footprint
Anglický název
Druh
Článek WoS
Originální abstrakt
The aim of the paper is to quantify the construction production carbon footprint per m3 of the built-up volume of the building. In order to determine the carbon footprint, 5 typical detached houses were selected. The individual buildings have the same material-construction characteristics; however, they differ in the size of the built-up volume, i.e. also in the built-up area. The LCA software was used to quantify the carbon footprint during the production phase of the model houses project. A budget indicator per m3 of the built-up volume was determined based on these calculations.
Anglický abstrakt
Klíčová slova
budget indicator; built-up volume; carbon footprint; construction production; life cycle
Klíčová slova v angličtině
Autoři
Rok RIV
2024
Vydáno
31.03.2023
Nakladatel
Croatian Association of Civil Engineers (HSGI)
Místo
Zagreb, Croatia
ISSN
1333-9095
Periodikum
Gradevinar
Svazek
75
Číslo
3
Stát
Chorvatská republika
Strany od
273
Strany do
281
Strany počet
9
URL
http://www.casopis-gradjevinar.hr/archive/article/3396
Plný text v Digitální knihovně
http://hdl.handle.net/11012/213656
BibTex
@article{BUT183558, author="Zdeněk {Krejza} and Gabriela {Kocourková} and Lucie {Vaňková} and Michaela {Šebestová}", title="Variants of determining the construction production carbon footprint", journal="Gradevinar", year="2023", volume="75", number="3", pages="273--281", doi="10.14256/JCE.3396.2021", issn="0350-2465", url="http://www.casopis-gradjevinar.hr/archive/article/3396" }
Dokumenty
JCE-75-2023-3-5-3396-EN