Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikace
PAŘÍLKOVÁ, J. PAŘÍLEK, L. PICKA, D. STRAČÁNEK, P. GARDAVSKÁ, Z. ŠAFÁŘ, R. FEJFAROVÁ, M.
Originální název
MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
For the needs of the Czech Anglers' Union seated in the municipality of Jevíčko, a pond has been built. Points were determined on the pond dam, where the relationship between soil moisture and the height of the water level in the pond was monitored by the indirect method of electrical impedance spectrometry. The monitoring was started on September 2008. Even after several repairs of the earth-fill dike of the Bezednik reservoir near the municipality of Kobeřice, also this hydraulic structure is monitored. The monitoring was started on June 2006. The works in both localities being realized by solving the international project E!3838 of the European programme EUREKA and proceeding further with project E!4981. Some of the results are included in the submitted paper.
Klíčová slova
soil, moisture, water level, pond, electrical impedance spectrometry
Autoři
PAŘÍLKOVÁ, J.; PAŘÍLEK, L.; PICKA, D.; STRAČÁNEK, P.; GARDAVSKÁ, Z.; ŠAFÁŘ, R.; FEJFAROVÁ, M.
Rok RIV
2010
Vydáno
9. 9. 2010
Nakladatel
VUTIUM
Místo
Brno
ISBN
978-80-214-4117-0
Kniha
EUREKA 2010, Schedule and Proceedings
Edice
neuv
Číslo edice
1
Strany od
134
Strany do
144
Strany počet
11
BibTex
@inproceedings{BUT34841, author="Jana {Pařílková} and Luboš {Pařílek} and Daniel {Picka} and Pavel {Stračánek} and Zuzana {Gardavská} and Robert {Šafář} and Marie {Fejfarová}", title="MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE", booktitle="EUREKA 2010, Schedule and Proceedings", year="2010", series="neuv", number="1", pages="134--144", publisher="VUTIUM", address="Brno", isbn="978-80-214-4117-0" }